VIP onlyFREE €5.000 Engineering
Factories · Build Kits

Build kits ready for assembly.Less waste. More time.

We help carpenters and contractors save time and timber by delivering precision-cut build kits — ready to raise directly on site.

Made in Denmark
+50,000 m² delivered
Only 2-6% waste
— From sketch to finished kit

Timber construction made simple

We're with you all the way

01
Series & multi-storey

Townhouses

Scalable kits for dense low-rise across multiple floors.

02
Large-scale

Public buildings

Schools, kindergartens and municipal projects.

03
Private & commercial

Summer houses

Dream homes and holiday cabins in record time.

04
Small-scale

Extensions

Add-ons, dormers and conservatories — no waiting.

— Three promises

Build faster. Build cheaper. Build better.

Build faster

Pure assembly, Everything fits perfectly, Anyone can build it

Build cheaper

Cheaper to produce, Cheaper to build, Only 2-6% material waste

Build better

ID-tags and assembly order, Low CO₂ footprint, Better working conditions

Case: Agricultural school

700 m² agricultural school in 2 floors — built in record time with 4.8% waste

For the Nordfyn Agricultural School we delivered prefabricated kits with precision-cut joinery. The result: build time without delays, almost no construction waste — and only 4.8% waste on more than 8 km of structural timber.

Key figures
4.8 %
Material waste
8,066 m
Total linear length
Few trucks
Fast assembly
— Process

How does it work?

From idea to finished build kit — we guide you through the whole process.

Step 01
Step 01

Digitising the project

We build the project digitally, stud by stud, together with the architect and engineer.

  • Full digital 3D model of the entire structure
  • All connections solved before construction starts
  • Close collaboration with architect and engineer
Step 02
Step 02

We digitise and optimise the structure

We optimise joints and structure to save material and time.

  • Smarter joints and fewer components
  • Material-saving design
  • Faster and simpler erection
Step 03
Step 03

Automated production by robot

Robots cut the timber to millimetre precision and pack the kit in assembly order.

  • Millimetre-precise cutting
  • ID-marking on every piece
  • Packed in assembly order
Step 04
Step 04

Delivered to the site — ready for assembly

The kit arrives on pallets, logically packed and ready to raise.

  • Fewer shipments and smarter packing
  • Less clutter on site
  • Build-ready elements straight to use
— Contents

What's in a build kit?

The kit is optimised and tailored to your specific needs.

What's in a build kit?
— FAQ

Frequently asked questions

How quickly can you deliver a kit?

Typically within 4-8 weeks from approved project, depending on size and complexity.

Do you also deliver LCA calculations?

Yes — we deliver LCA documentation aligned with BR18 and voluntary sustainability class.

Do you offer engineering calculations?

Yes, we have in-house engineers and partner with externals when needed.

Can I use my own architects/engineers?

Absolutely. We're happy to build on your existing drawings and structural plans.

Can I pick up the kit myself?

Yes, you can collect from the factory — or we deliver directly to site.

How much waste do you typically reduce?

From the industry's 15-25% down to 2-6%. On large projects we've hit 4.8%.

What types of construction can you handle?

Townhouses, public buildings, summer houses, extensions — from 30 m² to 1,000+ m².

Your solution starts here

Have a project coming up? Let's talk about how we can help you save time and minimise waste. Get a free quote — ready in 48 hours.