Materials · Methods · Assembly

Timber kits, elements
or loose timber?
Choose the right fit for your project.

How much should be completed upon delivery — and what work do you want to handle yourself? A practical guide for carpenters who want to choose their construction method with open eyes.

By WoodStocks / W-NewsDecision guide
Illustration of a timber frame shell with exposed posts and rafters
Illustrative material from WoodStocks’ website. Not a documented customer case. The drawings below illustrate principles, not structural design details. Image created with AI.

An extension, a holiday home, and a larger residential build place different demands on planning, delivery, and assembly. It is therefore worth evaluating the construction method before ordering materials.

The choice is also about how your business operates. Here we compare three delivery models. The right solution must always be assessed on the basis of the project and the supplier's quote.

01 / Understand the difference

Three ways to organize the work.

The difference lies primarily in how much machining and pre-assembly has been completed by the time the timber arrives.

01 / DELIVERY

Loose timber

Materials for further machining. Measuring, cutting to size and fitting are carried out on site or in your own workshop, depending on the agreement.

03 / DELIVERY

Prefabricated timber elements

Larger, assembled building components. Insulation, cladding and windows may be included, but the degree of completion must be stated in the quotation.

CNC machining for assembly-ready timber components is widely used in the industry. Equipment and the agreed scope determine the delivery. Source 1.

02 / Your overview

Ask the same questions
across all three solutions.

What you need to clarify
Loose timber
Timber building kit
Prefabricated timber elements
What do you receive?
Loose timberMaterials for machining
Timber building kitMachined individual parts
Prefabricated timber elementsAssembled building components
On-site work
Loose timberMachining, fitting and assembly
Timber building kitAssembly, inspection and agreed adjustments
Prefabricated timber elementsLifting, positioning, joints and completion
Clarify before ordering
Loose timberMaterials, dimensions and project requirements
Timber building kitProduction dimensions, machining and joints
Prefabricated timber elementsDivision into elements, build-up and connections
Check the logistics
Loose timberUnloading, storage and work area
Timber building kitPackages, erection sequence and lifting requirements
Prefabricated timber elementsTransport dimensions, access and lifting plan

Typical differences — use this overview as a checklist, not as a guarantee of a specific delivery scope.

03 / The project comes first

What limits
your next build?

Are labour resources tight? Is site access restricted? Does the structure need to tie into an existing building? Start with the conditions that could complicate the job.

  • Unresolved site conditions: What can be surveyed before ordering, and what must be adapted on site?
  • Extensive machining: Which operations can be moved to off-site production?
  • Repetitive building components: Can prefab elements accommodate site access, crane lifting plans, and the desired level of finish?

Choice of system, component sizing, transport, and assembly must be evaluated together early on. Source 2.

Illustration of timber frame viewed from the gable end
WoodStocks illustrative material. Project dimensions and technical specifications must be clarified separately. Image created with AI.
04 / Prior to production

A good timber kit starts with a fully resolved project design.

Dimensions, joints, and interfaces must be coordinated. It must also be explicit which drawing revision is approved, and who signs off the project for production.

Prefabricated timber construction typically requires finalized, coordinated drawings earlier than projects built mostly on site. Source 3.

  • Who verifies dimensions against the foundation and existing structures?
  • Who designs the joints and fixings?
  • How are design changes handled after sign-off?
  • Which drawings and assembly details are supplied?

See also the process from drawing to timber kit.

The right quote also specifies the remaining scope of work once the delivery arrives on site.
05 / Compare the entire scope

Factor in more than just the materials.

Materials+ Design+ Machining+ Transport+ Lifting+ Labour hours+ Waste management

Include relevant project costs, and avoid double-counting the same scope. A bill of materials and a quote for machined components cover different scopes of supply.

At WoodStocks, pricing is assessed on a project-by-project basis. There is no single saving or square-metre price that applies to all structures. Compare the same structure, quality, and scope of delivery.

06 / From delivery to assembly

Plan for the day the timber arrives.

A pre-machined structure must still be unloaded, handled, and erected. Deliveries must align with the construction schedule, and transport constraints should be factored into design. Source 4.

01Access

Can the delivery reach the site and be unloaded as planned?

02Sequence

Can the crew access the parts needed first?

03Protection

Where will the timber be stored, and who will protect it?

04Erection

Have responsibilities, lifting and the basis for erection been clarified?

07 / Your next step

Choose based on the work
to be carried out.

A robot-cut timber kit is worth evaluating when you want precision-machined components and will handle assembly on site. Prefab elements are relevant when you want larger sections pre-assembled before delivery. Loose timber belongs in the equation when on-site cutting and bespoke framing are central.

Read more about timber building kits or continue with Let the robot do the cutting. Apply your craft where it counts.

Documentation

Sources for the technical points

  1. Pabst Holzindustrie: CNC Joinery Service — example of industrial component processing.
  2. NZ Wood Design Guides: Designing for Prefabrication — system selection, logistics, and early planning.
  3. Build-in-Wood: Prefabrication — pre-production coordination.
  4. Build-in-Wood: Logistics — transport, delivery, and weather protection.

The sources describe general methods. They do not document specific cost savings at WoodStocks. The assessment criteria in this guide are editorial recommendations.