A kit for your holiday-home design
Define the floor plan, roof geometry, openings and intended use before requesting a kit. A single-storey holiday home and a multi-level design have different structural and delivery requirements.
Prepare a holiday-home timber kit with clear drawings, structural interfaces and an agreed delivery scope.
Discuss your project
Define the floor plan, roof geometry, openings and intended use before requesting a kit. A single-storey holiday home and a multi-level design have different structural and delivery requirements.
Confirm how foundations, moisture protection, roof build-up and faΓ§ade interfaces connect to the timber structure. Establish responsibility for temporary protection and on-site assembly in the project agreement.
The quotation must identify the timber components, cutting, labelling and documentation included. Do not assume that foundations, roofing, insulation, finishes, installations, site equipment or assembly are included unless the agreed scope says so.
Prepare the current drawings, dimensions, intended use and site requirements. An IFC model can support the structural review; material sections and quantities must come from the accepted project, not an estimate from a picture. Resolve engineering, permissions and interfaces before production is approved.
Send the current plans, sections and dimensions you have. We review the material with you and clarify what else is needed.
The quotation identifies the components, processing, documentation and services included, together with responsibilities and exclusions.
Create a partner account to submit your project through the existing workspace, or contact WoodStocks to discuss the information needed. The final scope, price and logistics depend on the reviewed project and written agreement.